GenFrontier homeScope a project
Menu
Ship fromGenFrontier LLC
Kansas City, Missouri
Deliver toOperations, warehouse and IT teams at US distributors, manufacturers and 3PLs
Logistics tracking and inventory software

Know where every unit is.

We build shipment tracking and inventory software around the ERP and WMS you already run, then document it and train the people who use it.

Scope a projectFollow an example project

requirements / plan / build / document / onboard
A screenprinted cardboard carton with a red thread tied to it, the thread winding back across the paper to a small open doorway in the distance
We start with
Your process, not a product demo
You bring
Process owners, sample data, test access
You receive
Software, source code, documents, training
Office
Ward Parkway, Kansas City
Example with fictional data

One inbound pallet, six scans.

Follow one pallet from the gate to the bin. The receipt is what the floor scans. The record is what the software keeps, including the case that did not arrive.

Walk through the full example project

  1. Wed 13:22, gateTrailer in, ASN for PO 4471 linked
  2. Wed 13:31, door 3Unloading started
  3. Wed 13:40, door 3SSCC scanned: PO 4471, line 1
  4. Wed 13:51, door 3Received 39 of 40
  5. Wed 14:12, stagingPut-away started
  6. Wed 14:30, bin B-14Put away, available

Inventory record, item EX-20118

Expected
40 cases on ASN
Received
39 cases
Exception
1 case short, sent to the buyer while the trailer is still at the door
Location
Bin B-14, level 2
Available to promise
39 cases from 14:30 Wednesday
Audit trail
6 scans by 3 people, each with a time, a place and a user

How an engagement runs

Six stages, each ending with something your team reviews or signs. Requirements come before code and documentation is part of the work, not an afterthought. Read how we work.

StageWhat happensWhat you review or sign
01 Walk the processWe watch receiving, storage and shipping and collect sample orders, ASNs, labels and exports.A list of process steps and exceptions
02 Write the requirementsEach requirement gets an acceptance test, so "done" is agreed before build starts.The requirements document
03 Plan the projectMilestones, owners, test windows and a cutover date clear of your peak season.A dated project plan
04 Build and integrateWorking software in short increments, connected to your systems and partners in test.Demos using your own sample data
05 Test and cut overAcceptance testing, data conversion and a readiness review with a rollback plan.The go or no-go decision
06 Document and onboardRunbooks, an admin guide and role-based training on your devices, then support.Trained users and the documentation set

The packing list for a project

What we need from you, and what you have when we finish. Compare engagement types.

What you provide

  1. A process owner who can make decisions, and an IT contact
  2. Sample orders, ASNs, labels and inventory exports
  3. Access to test environments for the systems we connect
  4. Time from the people who do the work, for the walk and for testing
  5. Contacts at carriers, suppliers or customers we exchange data with

What you receive

  1. A requirements document with acceptance tests
  2. A dated project plan with owners and a cutover date
  3. Working software, its source code and integration specifications
  4. Test results and a go-live readiness record
  5. Runbooks, an administrator guide, training and a support plan

Notices that change the data you keep

Rules and standards that reach into receiving, labeling, shipping and inventory records. Each links to its primary source.

  1. Freight class moves toward density. The NMFC density scale grew to 13 subprovisions, with new classes for denser freight. Measured dimensions now decide more LTL bills.Source: NMFTADensity calculator
  2. Parcel dimensions round up. UPS and FedEx divide by 139 at daily rates and round any fraction of an inch up to the next inch.Source: UPSDimensional weight calculator
  3. De minimis entries end for low-value imports. CBP's interim final rule requires formal or informal entry for non-postal shipments valued at $800 or less, so duty data belongs in landed cost.Source: Federal RegisterIntegration notes
  4. 2D barcodes at retail checkout. GS1 US is leading retail toward point-of-sale scanning of 2D codes that carry a GTIN through GS1 Digital Link.Source: GS1 USLabeling service
  5. Food traceability enforcement begins. Under a congressional directive, FDA will not enforce the FSMA 204 traceability rule before this date. Records still have to be producible within 24 hours of a request once it applies.Source: FDAKDE worksheet

Scope your project.

Tell us what you need to track, which systems you run and when it has to work. We reply with questions or a time to talk.